Safety, QA/QC & Standards
HSE discipline and inspection rigor for operating plants
TIL’s Health, Safety & Environmental policy and Quality Management System are designed for work inside live refineries and chemical complexes—where uncontrolled activity is not an option.
HSE Policy · ISO-aligned QA/QC · Live-plant risk controls
HSE Policy
Protect people first, then schedule
Field leadership is accountable for safe work planning. Production pressure does not override permit compliance or stop-work authority.
Health & Safety
- Mandatory inductions and craft competency verification
- Permit-to-work, LOTO, and energy isolation verification
- Confined-space entry with attendant and rescue readiness
- Daily toolbox talks tied to the active work package
Environmental Controls
- Spill prevention and secondary containment at work fronts
- Waste stream segregation and documented disposal routes
- Dust, noise, and emissions controls per client limits
- Demolition and cleaning scopes with environmental hold points
Assurance & Reporting
- Leading and lagging indicator tracking by project
- Incident investigation with corrective action closure
- Stop-work authority for all personnel on site
- Client audit support and evidence packs on demand
Quality Management System
ISO-aligned QA/QC inspections
Inspection and Test Plans (ITPs) define hold, witness, and review points for fabrication and field installation.
| Control Area | Standard / Protocol | Typical Evidence |
|---|---|---|
| Welding procedures | WPS / PQR per ASME IX / project code | Approved WPS binder, welder quals, weld maps |
| NDT testing | RT / UT / MT / PT as per ITP | NDT reports, technician certifications, film logs |
| Material traceability | Heat / lot tracking to spool or assembly | MTRs, receiving inspection, material marks |
| Dimensional & hydrotest | ITP hold / witness points | Fit-up records, hydrotest certificates, punch lists |
Live-Plant Risk Mitigation
Protocols for refineries & chemical complexes
Work adjacent to operating units requires SIMOPS awareness, gas testing regimes, and continuous coordination with operations.
Pre-mobilization
Scope hazard analysis, client induction scheduling, equipment certification review, and emergency response interface mapping.
During execution
Active permit boards, gas tests at defined intervals, barrier management, and escalation paths to client operations for process upsets.
Hot work & confined space
Fire watch coverage, continuous atmospheric monitoring where required, rescue plans rehearsed before entry, and hot-work isolation verification.
Demobilization
Housekeeping clearance, temporary facility removal, open-permit close-out, and lessons-learned capture for the next campaign.
Request HSE & QA documentation packs